19 MW Solar operating in Isle of Wight, VA — PJM Interconnection, LLC
19 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2016
Operating Since
Coordinates
36.8913, -76.6138
County
Isle of Wight, VA
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Virginia Electric & Power Co | Virginia Electric and Power | — |
| Owner(s) | Virginia Electric & Power Co | Dominion Energy | — |
| Status | Operating | operating | — |
Woodland Solar Farm is a 19 MW solar photovoltaic power plant located in Isle of Wight County, Virginia. The plant began operating in 2016 and has one generator. It is owned by Dominion Energy and operated by Virginia Electric & Power Co. The solar farm utilizes single-axis tracking technology to maximize energy capture. Woodland Solar Farm is ranked 101st out of 168 power plants in Virginia and 1600th nationally out of 7108 plants.
The plant's latest annual generation was 32,166 MWh, resulting in a capacity factor of 19.3%. The installed cost was $2179.5 per kW, according to FERC data. The plant operates within the PJM Interconnection, LLC balancing authority and the SERC NERC region.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
34.5 kV
Regulatory Status
RE
Entity Type
Investor-Owned Utility
Sector
Electric Utility
1.7K MWh
Latest Month
32.2K MWh
Annual Generation
19.3%
Capacity Factor
$2,315/kW
Installed Cost
$11.2/MWh
Operating Cost
VIRGINIA ELECTRIC AND POWER COMPANY
Reporting Utility
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Point of Interconnection
Nearest Substation
Chuckatuck Substation · 230 kV
Substation Distance
4.077 km
Operator
Dominion Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
BENNSCH 34.5 KV BTM
Pricing Hub
DOMINION HUB
Node Source
Curated node match
Dominion Energy delivers first power from Coastal Virginia Offshore Wind project (D:NYSE)
Dominion Energy's 2.6 GW Coastal Virginia Offshore Wind project has reached first power, with the project's first turbine generating power...
Dominion Energy delivers first power from Coastal Virginia Offshore Wind project (D:NYSE)
Dominion Energy's 2.6 GW Coastal Virginia Offshore Wind project has reached first power, with the project's first turbine generating power...
Campbell County leaders approve solar farm site off Brookneal Highway
CAMPBELL COUNTY, Va. (WSET) — The Campbell County Board of Supervisors voted 6-1 to allow Dominion Energy to build a solar farm off...
Virginia gas plant moves ahead despite community objections | Energy
Tense public hearings and protests mocking Dominion Energy have followed the proposed natural gas plant in Chesterfield County, VA,...
Last updated 2026-03-26
View all 10 articles