1.5 MW Solar operating in Kings, CA — California Independent System Operator
1.5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2016
Operating Since
Coordinates
36.2573, -119.7974
County
Kings, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AES Distributed Energy | AES Distributed Energy | — |
| Owner(s) | AES Distributed Energy | — | — |
| Status | Operating | operating | — |
Lemoore 1 is a 1.5 MW solar photovoltaic power plant located in Kings County, California. The plant began operating in 2016 and has a single generator. It is owned and operated by AES Distributed Energy. The facility utilizes single-axis tracking to maximize solar energy capture.
The plant's latest annual generation was 1,366 MWh, resulting in a capacity factor of 10.4%. Lemoore 1 is interconnected to the California Independent System Operator (CAISO) balancing authority and operates within the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, Lemoore 1 is ranked 641 out of 862 solar plants in California, and 5927 out of 7108 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
12.3 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
25 MWh
Latest Month
1.4K MWh
Annual Generation
10.4%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
LEMORSLR_7_N001
Pricing Hub
TH_NP15_GEN-APND
Secondary Zone
TH_ZP26_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match