20 MW Solar operating in Tulare, CA — California Independent System Operator
20 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2016
Operating Since
Coordinates
35.8503, -119.0260
County
Tulare, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Consolidated Edison Development Inc. | Consolidated Edison Development Inc. | — |
| Owner(s) | Consolidated Edison Development Inc. | Consolidated Edison Development Inc. [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as Consolidated Edison Development Inc. [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
CED Ducor 4 is a 20 MW solar photovoltaic power plant located in Tulare County, California. The plant, which began operating in 2016, utilizes single-axis tracking technology. It is owned and operated by Consolidated Edison Development Inc. The plant is interconnected to the California Independent System Operator (CAISO) balancing authority within the Western Electricity Coordinating Council (WECC) NERC region.
In its most recent year of operation, CED Ducor 4 generated 51,555 MWh of electricity, achieving a capacity factor of 29.3%. The plant has a power purchase agreement (PPA) price of $62.44 per MWh. CED Ducor 4 ranks as the 139th largest solar plant in California out of 862, and 1419th nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
66 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
1.9K MWh
Latest Month
51.6K MWh
Annual Generation
29.3%
Capacity Factor
$58.4/MWh
LCOE (Levelized Cost)
$62.4/MWh
PPA Price
$12.3/MWh
Energy Value
Market Position
ISO/RTO Market
CAISO
LMP Node
DUCORGN3_7_N001
Pricing Hub
TH_SP15_GEN-APND
Secondary Zone
TH_ZP26_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match