4 MW Solar operating in Hampden, MA — ISO New England Inc.
4 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2016
Operating Since
Coordinates
42.2181, -72.3134
County
Hampden, MA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Syncarpha Bondsville, LLC | Syncarpha Bondsville | — |
| Owner(s) | Syncarpha Bondsville, LLC | — | — |
| Status | Operating | operating | — |
Palmer Landfill is a 4 MW solar photovoltaic power plant located in Hampden County, Massachusetts. The plant began operating in 2016 and has one generator. It is owned and operated by Syncarpha Bondsville, LLC. The plant's primary fuel source is solar energy.
The Palmer Landfill plant operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In the most recent year of data, the plant generated 6,266 MWh of electricity, achieving a capacity factor of 17.9%. Palmer Landfill is ranked as the 77th largest solar plant in Massachusetts out of 435, and 3,543rd nationally out of 7,108 plants. The solar panels utilize a fixed tilt tracking system.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
13.2 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
269 MWh
Latest Month
6.3K MWh
Annual Generation
17.9%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Thorndike Substation · 115 kV
Substation Distance
3.098 km
Operator
National Grid
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
HC.THORNDIK13.2
Pricing Hub
.H.INTERNAL_HUB
Node Source
Curated node match