1773.3 MW Natural Gas operating in Greensville, VA — PJM Interconnection, LLC
1,773.3 MW
Nameplate Capacity
4
Generators
units
Natural Gas Fired Combined Cycle
Technology
2018
Operating Since
Coordinates
36.7182, -77.6496
County
Greensville, VA
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Virginia Electric & Power Co | Virginia Electric and Power | — |
| Owner(s) | Virginia Electric & Power Co | Dominion Energy | — |
| Status | Operating | — | — |
Greensville County Power Station is a 1773.3 MW natural gas-fired combined cycle power plant located in Greensville County, Virginia. The plant began operating in 2018 and is owned by Dominion Energy and operated by Virginia Electric & Power Co. It consists of four generators utilizing natural gas as its primary fuel source. The plant is the largest in Virginia out of 20 plants in the state, and ranks 40th nationally out of 945 plants.
The plant operates within the PJM Interconnection, LLC balancing authority and the SERC NERC region. In its latest year of reported generation, the plant produced 11,337,552 MWh of electricity, achieving a capacity factor of 73.0%. Financial data indicates an installed cost of $726.73 per kW, according to FERC data.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
500 kV
Regulatory Status
RE
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Greensville Generating Facility
1.2M MWh
Latest Month
11.3M MWh
Annual Generation
73.0%
Capacity Factor
$786/kW
Installed Cost
$7.8/MWh
Operating Cost
VIRGINIA ELECTRIC AND POWER COMPANY
Reporting Utility
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Market Position
ISO/RTO Market
PJM
LMP Node
Carson Substation
Pricing Hub
DOMINION HUB
Node Source
EIA-860 direct report
Dominion Energy delivers first power from Coastal Virginia Offshore Wind project (D:NYSE)
Dominion Energy's 2.6 GW Coastal Virginia Offshore Wind project has reached first power, with the project's first turbine generating power...
Dominion Energy delivers first power from Coastal Virginia Offshore Wind project (D:NYSE)
Dominion Energy's 2.6 GW Coastal Virginia Offshore Wind project has reached first power, with the project's first turbine generating power...
Campbell County leaders approve solar farm site off Brookneal Highway
CAMPBELL COUNTY, Va. (WSET) — The Campbell County Board of Supervisors voted 6-1 to allow Dominion Energy to build a solar farm off...
Virginia gas plant moves ahead despite community objections | Energy
Tense public hearings and protests mocking Dominion Energy have followed the proposed natural gas plant in Chesterfield County, VA,...
Last updated 2026-03-26
View all 10 articles