20 MW Solar operating in Kings, CA — California Independent System Operator
20 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2016
Operating Since
Coordinates
36.1484, -119.5891
County
Kings, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Consolidated Edison Development Inc. | Consolidated Edison Development Inc. | — |
| Owner(s) | Consolidated Edison Development Inc. | Consolidated Edison Development Inc. [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as Consolidated Edison Development Inc. [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
Corcoran Solar 3 is a 20 MW solar photovoltaic power plant located in Kings County, California. The plant, which began operating in 2016, has a single generator and utilizes single-axis tracking. Consolidated Edison Development Inc. is the plant's operator. Corcoran Solar 3 ranks 146th out of 862 solar plants in California and 1433rd nationally out of 7108 plants.
The plant's latest annual generation was 46,423 MWh, resulting in a capacity factor of 26.4%. Corcoran Solar 3 operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Financial data is available for the plant from LBNL, though specific figures are not provided.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
115 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
1.6K MWh
Latest Month
46.4K MWh
Annual Generation
26.4%
Capacity Factor
$57.6/MWh
LCOE (Levelized Cost)
$-8.7/MWh
Energy Value
Market Position
ISO/RTO Market
CAISO
LMP Node
CORCRAN2_7_N001
Pricing Hub
TH_NP15_GEN-APND
Secondary Zone
TH_ZP26_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
Last updated 2026-03-26
View all articles