3.5 MW Solar operating in Polk, FL — Tampa Electric Company
3.5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2012
Operating Since
Coordinates
27.9917, -82.0453
County
Polk, FL
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Sun E N7 Holdings LLC | NVT LICENSES | — |
| Owner(s) | Sun E N7 Holdings LLC | SE Solar Trust VII [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as SE Solar Trust VII [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
The Lakeland Electric Co. - Airport II solar photovoltaic plant is located in Polk County, Florida. The plant has a total capacity of 3.5 MW and consists of a single generator. It commenced operations in 2012 and is owned/operated by Sun E N7 Holdings LLC. The plant utilizes single-axis solar tracking technology.
In the most recent year with available data, the plant generated 2,228 MWh of electricity, resulting in a capacity factor of 7.2%. The Airport II plant operates within the balancing authority of Tampa Electric Company and is located within the SERC NERC region. It is ranked as the 206th largest power plant in Florida out of 227 plants, and 3666th nationally out of 7108 plants. The plant's primary fuel source is solar.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Tampa Electric Company
Grid Voltage
1 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
138 MWh
Latest Month
2.2K MWh
Annual Generation
7.2%
Capacity Factor
No financial data available for this plant.
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.