1.2 MW Solar operating in Fresno, CA — California Independent System Operator
1.2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2014
Operating Since
Coordinates
36.1263, -120.2491
County
Fresno, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Team-Solar, Inc. | Team-Solar, Inc. | — |
| Owner(s) | SunE Pleasant Valley SP Owner, LLC | SunE Pleasant Valley SP Owner LLC [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as SunE Pleasant Valley SP Owner LLC [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
The CDCR (CA) - Pleasant Valley State Prison solar photovoltaic plant is located in Fresno County, California. The plant has a total capacity of 1.2 MW and commenced operations in 2014. It is operated by Team-Solar, Inc. The facility utilizes a single-axis tracking system to maximize solar energy capture.
The plant's latest annual generation was 2,822 MWh, resulting in a capacity factor of 26.8%. It is connected to the California Independent System Operator (CAISO) balancing authority within the Western Electricity Coordinating Council (WECC) region. The plant ranks 702nd in size among California power plants and 6,148th nationally.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
12.5 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
116 MWh
Latest Month
2.8K MWh
Annual Generation
26.8%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Jacalitio
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_ZP26_GEN-APND
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.