7.4 MW Natural Gas operating in New London, CT — ISO New England Inc.
7.4 MW
Nameplate Capacity
2
Generators
units
Other Natural Gas
Technology
2022
Operating Since
Coordinates
41.4000, -72.0860
County
New London, CT
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Connecticut Mun Elec Engy Coop | — | — |
| Owner(s) | Fuel Cell Energy | — | — |
| Status | Operating | — | — |
The Subase Microgrid Project is a 7.4 MW natural gas-fired power plant located in New London County, Connecticut. The plant began operating in 2022 and consists of two generators utilizing "Other Natural Gas" technology. It is owned and operated by Connecticut Municipal Electric Energy Cooperative (CMEEC). The plant is connected to the ISO New England Inc. balancing authority and is within the Northeast Power Coordinating Council (NPCC) NERC region.
In its latest year of operation, the Subase Microgrid Project generated 43,080 MWh of electricity, achieving a capacity factor of 66.0%. The plant ranks 24th out of 49 power plants in Connecticut by capacity, and 1504th out of 1963 plants nationally.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
13.8 kV
Regulatory Status
RE
Entity Type
Cooperative
Sector
Electric Utility
3.3K MWh
Latest Month
43.1K MWh
Annual Generation
66.0%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
ISO-NE
LMP Node
—
Pricing Hub
.Z.CONNECTICUT
Node Source
Shared substation inference