1.8 MW Solar operating in San Bernardino, CA — California Independent System Operator
1.8 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2015
Operating Since
Coordinates
34.1003, -117.5525
County
San Bernardino, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Altus Power America Management, LLC | Altus Power America Management | — |
| Owner(s) | Altus Power America Management, LLC | — | — |
| Status | Operating | operating | — |
Rancho Cucamonga Dist #1 is a 1.8 MW solar photovoltaic power plant located in San Bernardino County, California. The plant began operating in 2015 and has one generator. It is owned and operated by Altus Power America Management, LLC. The plant's primary fuel source is solar energy.
In its most recent year of operation, Rancho Cucamonga Dist #1 generated 2,976 MWh of electricity, achieving a capacity factor of 18.8%. The plant utilizes a fixed tilt solar tracking system. It operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. The plant ranks 557th in size among California's 862 power plants and 5505th nationally out of 7108 plants.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
12 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
170 MWh
Latest Month
3.0K MWh
Annual Generation
18.8%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
ETIWANDA_6_N008
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match