200.1 MW Wind operating in Comanche, TX — Electric Reliability Council of Texas, Inc.
200.1 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2015
Operating Since
Coordinates
31.8284, -98.6933
County
Comanche, TX
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Pattern Operators LP | Pattern Energy | — |
| Owner(s) | Logans Gap Wind LLC | Pattern Energy [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as Pattern Energy [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
Logans Gap Wind LLC is a 200.1 MW wind power plant located in Comanche County, Texas. The facility began operating in 2015 and utilizes onshore wind turbine technology. The plant consists of a single generator and is operated by Pattern Operators LP. The primary fuel source is wind (WND).
The plant's wind turbines have a hub height of 80 meters and a rotor diameter of 108 meters. The turbines were manufactured by Siemens and are model SWT-2.3-108. Logans Gap Wind operates within the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority. In the most recent year of data, the plant generated 604,021 MWh, achieving a capacity factor of 34.5%. The plant ranks 98th out of 200 wind plants in Texas and 300th out of 734 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Logans Gap Wind I
68.6K MWh
Latest Month
604.0K MWh
Annual Generation
34.5%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Logan's Gap Wind Substation · 138 kV
Substation Distance
0 km
Operator
Pattern Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
LGW_UNIT_ALL
Pricing Hub
HB_NORTH
Secondary Zone
LZ_NORTH
Location Type
Resource Node
Node Source
Curated node match
Fact-check: Do wind turbines cost more to build than the energy they produce?
A Facebook post casts wind power as a losing proposition. Most studies put the energy payback period for a wind turbine at about a year or...
How Walmart is leveraging DERs for its 100% renewable energy goal
The retail giant is already a rooftop solar leader and is now applying its massive market power to energy storage.
Last updated 2026-03-14
View all articles