50 MW Solar operating in Kern, CA — Los Angeles Department of Water and Power
50 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2016
Operating Since
Coordinates
35.2536, -118.0269
County
Kern, CA
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AES Distributed Energy | Hecate Energy; Sustainable Power Group | — |
| Owner(s) | AES Distributed Energy | Hecate Energy; Sustainable Power Group LLC | — |
| Status | Operating | operating | — |
GEM identifies the owner as Hecate Energy; Sustainable Power Group LLC
This entity is not yet in the GEM ownership database — chain unavailable.
Hecate Energy Beacon Solar 4 is a 50 MW solar photovoltaic power plant located in Kern County, California. The plant began operating in 2016 and has one generator. The primary fuel source is solar energy. AES Distributed Energy is the plant's operator. The facility's solar tracking technology is single-axis. Hecate Energy Beacon Solar 4 operates within the Los Angeles Department of Water and Power balancing authority and the Western Electricity Coordinating Council (WECC) NERC region.
In its most recent year of reported generation, the plant produced 115,929 MWh, achieving a capacity factor of 26.4%. Hecate Energy Beacon Solar 4 ranks as the 78th largest solar plant in California out of 862, and 1129th nationally out of 7108. Financial data indicates that the plant has a power purchase agreement (PPA) price of $62.73 per MWh.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
Los Angeles Department of Water and Power
Grid Voltage
34.5 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
TEHACHAPI VALLEY SOLAR I
5.2K MWh
Latest Month
115.9K MWh
Annual Generation
26.4%
Capacity Factor
$51.8/MWh
LCOE (Levelized Cost)
$62.7/MWh
PPA Price
$8.9/MWh
Energy Value
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.
Arevon’s 758MW/1,200MWh Eland Solar-plus-Storage takes Los Angeles to over 60% clean energy
Arevon's Eland Solar-plus-Storage Center in Los Angeles, California, is complete, comprising 758MW of solar and 1200MWh battery storage.
Feds to Lease 8,000 Acres at Hanford Nuclear Waste Site for Solar Power, Batteries
Hecate Energy LLC, a Chicago-based renewable power developer, owner and operator, is negotiating with the U.S. Energy Dept. to build a...
Feds to Lease 8,000 Acres at Hanford Nuclear Waste Site for Solar Power, Batteries
Hecate Energy LLC, a Chicago-based renewable power developer, owner and operator, is negotiating with the U.S. Energy Dept. to build a...
Feds to Lease 8,000 Acres at Hanford Nuclear Waste Site for Solar Power, Batteries
Hecate Energy LLC, a Chicago-based renewable power developer, owner and operator, is negotiating with the U.S. Energy Dept. to build a...
Last updated 2026-03-14
View all 10 articles