1.5 MW Wind operating in Kent, RI — ISO New England Inc.
1.5 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2016
Operating Since
Coordinates
41.6956, -71.7208
County
Kent, RI
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | WED Coventry Three, LLC | — | — |
| Owner(s) | Narragansett Bay Commission | — | — |
| Status | Operating | — | — |
WED Coventry 3 is a 1.5 MW wind power plant located in Kent County, Rhode Island. The plant began operating in 2016 and is owned and operated by WED Coventry Three, LLC. It consists of a single onshore wind turbine. The plant is interconnected to the ISO New England Inc. balancing authority and operates within the NPCC NERC region. According to state rankings, the plant is the 16th largest of 20 wind facilities in Rhode Island. Nationally, it ranks 1399 out of 1424 wind plants.
The wind turbine at WED Coventry 3 is a Vensys82 model manufactured by Vensys, featuring a rotor diameter of 82.3 meters and a hub height of 85 meters. In the most recent year of data, the plant generated 2,220 MWh of electricity, achieving a capacity factor of 16.9%.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
620 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
299 MWh
Latest Month
2.2K MWh
Annual Generation
16.9%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
ISO-NE
LMP Node
—
Pricing Hub
.Z.RHODEISLAND
Node Source
OSM spatial match