3 MW Solar operating in Kings, CA — California Independent System Operator
3 MW
Nameplate Capacity
2
Generators
units
Solar Photovoltaic
Technology
2014
Operating Since
Coordinates
36.3068, -119.6302
County
Kings, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Arevon Energy, Inc. | Arevon Energy, Inc. | — |
| Owner(s) | Arevon Energy, Inc. | — | — |
| Status | Operating | operating | — |
Hanford 1 and 2 is a 3 MW solar photovoltaic power plant located in Kings County, California. The plant began operating in 2014 and consists of two generators utilizing fixed tilt solar tracking technology. Arevon Energy, Inc. is the plant's operator.
The plant's latest annual generation was 5,026 MWh, resulting in a capacity factor of 19.0%. Hanford 1 and 2 operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. The plant ranks 373rd out of 862 power plants in California and 3906th out of 7108 plants nationally.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
12 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
227 MWh
Latest Month
5.0K MWh
Annual Generation
19.0%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Hanford Switching Station
Substation Distance
4.404 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
GWFCT1_7_B1
Pricing Hub
TH_NP15_GEN-APND
Secondary Zone
TH_ZP26_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match