5.5 MW Solar operating in Bexar, TX — Electric Reliability Council of Texas, Inc.
5.5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2015
Operating Since
Coordinates
29.4799, -98.2995
County
Bexar, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Consolidated Edison Development Inc. | Consolidated Edison Development Inc. | — |
| Owner(s) | Consolidated Edison Development Inc. | — | — |
| Status | Operating | operating | — |
OCI Alamo 3 LLC is a 5.5 MW solar photovoltaic power plant located in Bexar County, Texas. The plant, which began operating in 2015, is owned and operated by Consolidated Edison Development Inc. It utilizes a single generator and employs dual-axis solar tracking technology to maximize energy capture. The plant's primary fuel source is the sun.
In its most recent year of operation, OCI Alamo 3 LLC generated 9,852 MWh of electricity, achieving a capacity factor of 20.4%. The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority and the TRE NERC region. OCI Alamo 3 LLC is ranked as the 258th largest power plant in Texas out of 298, and 2169th nationally out of 7108. Financial data is available for this plant from LBNL, though specific figures are not provided.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
34.5 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
563 MWh
Latest Month
9.9K MWh
Annual Generation
20.4%
Capacity Factor
$98.5/MWh
LCOE (Levelized Cost)
$24.3/MWh
Energy Value
Point of Interconnection
Nearest Substation
Martinez Substation · 138 kV
Substation Distance
< 10 km
Operator
CPS Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_SOUTH
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.