10 MW Wind operating in Chaves, NM — Southwest Power Pool
10 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2014
Operating Since
Coordinates
33.0139, -103.8650
County
Chaves, NM
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Chopin Wind, LLC | BayWa R.E. | — |
| Owner(s) | Anderson Wind Project, LLC | BayWa R.E. AG [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as BayWa R.E. AG [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
Anderson Wind II is a 10 MW wind power plant located in Chaves County, New Mexico. The plant began operating in 2014 and is owned and operated by Chopin Wind, LLC. It utilizes a single onshore wind turbine. As of its most recent ranking, Anderson Wind II is the 27th largest wind plant in New Mexico (out of 31) and 1151st nationally (out of 1424).
The plant's turbine is a Vestas V100-2.0 model, featuring a 100-meter rotor diameter and a hub height of 80 meters. In its most recent year of operation, Anderson Wind II generated 26,405 MWh of electricity, achieving a capacity factor of 30.1%. The plant operates within the Southwest Power Pool (SPP) balancing authority, which falls under the Midwest Reliability Organization (MRO) NERC region.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Southwest Power Pool
Grid Voltage
69 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
2.1K MWh
Latest Month
26.4K MWh
Annual Generation
30.1%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
SPP
LMP Node
—
Pricing Hub
—
Node Source
OSM spatial match