1.2 MW Solar operating in Fresno, CA — California Independent System Operator
1.2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2014
Operating Since
Coordinates
36.6679, -119.4150
County
Fresno, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Solarenewal LLC | Solarenewal | — |
| Owner(s) | Solarenewal LLC | — | — |
| Status | Operating | operating | — |
The 2081 Terzian Solar Project is a 1.2 MW solar photovoltaic power plant located in Fresno County, California. The plant began operating in 2014 and has one generator. It is owned and operated by Solarenewal LLC. The facility utilizes dual-axis solar tracking technology to maximize energy capture.
The plant's primary fuel source is the sun. In its latest year of reported generation, the plant produced 1,837 MWh of electricity, achieving a capacity factor of 17.4%. The 2081 Terzian Solar Project operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. It ranks as the 703rd largest solar plant in California out of 862, and 6150th nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
12 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
75 MWh
Latest Month
1.8K MWh
Annual Generation
17.4%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
REEDLEY_7_N002
Pricing Hub
TH_NP15_GEN-APND
Secondary Zone
TH_ZP26_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match