1 MW Solar operating in Somerset, NJ — PJM Interconnection, LLC
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2013
Operating Since
Coordinates
40.5603, -74.5534
County
Somerset, NJ
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Sunlight General Somerset Solar LLC | Sunlight General Somerset Solar | — |
| Owner(s) | Sunlight General Somerset Solar LLC | — | — |
| Status | Operating | operating | — |
Patriots Stadium is a 1 MW solar photovoltaic power plant located in Somerset County, New Jersey. The plant began operating in 2013 and is owned and operated by Sunlight General Somerset Solar LLC. It consists of a single generator utilizing fixed-tilt solar tracking technology. The plant's primary fuel source is solar energy.
In the most recent year of data, Patriots Stadium generated 1,131 MWh of electricity, achieving a capacity factor of 12.9%. The plant operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. In terms of size, Patriots Stadium ranks as the 305th largest solar plant in New Jersey out of 328, and 6666th nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
0.48 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
Commercial Non-CHP
50 MWh
Latest Month
1.1K MWh
Annual Generation
12.9%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Polhemus/Bridgewater Substation · 230 kV
Substation Distance
1.119 km
Operator
PSE&G
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
BRIDGEWA230 KV BRIDGSP
Pricing Hub
WESTERN HUB
Location Type
Generation Node
Node Source
Curated node match