39.6 MW Solar operating in Kinney, TX — Electric Reliability Council of Texas, Inc.
39.6 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2014
Operating Since
Coordinates
29.3198, -100.3860
County
Kinney, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Consolidated Edison Development Inc. | Consolidated Edison Development Inc. | — |
| Owner(s) | Consolidated Edison Development Inc. | Consolidated Edison Development Inc. [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as Consolidated Edison Development Inc. [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
OCI Alamo 4, LLC is a 39.6 MW solar photovoltaic power plant located in Kinney County, Texas. The plant began operating in 2014 and has one generator utilizing dual-axis tracking. It is owned and operated by Consolidated Edison Development Inc. The plant's primary fuel source is solar energy.
In the most recent year of data, OCI Alamo 4 generated 76,013 MWh of electricity, resulting in a capacity factor of 21.9%. The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority. OCI Alamo 4, LLC is ranked 225th out of 298 power plants in Texas and 1243rd out of 7108 plants nationally. Financial data is available for the plant from LBNL Solar.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
3.7K MWh
Latest Month
76.0K MWh
Annual Generation
21.9%
Capacity Factor
$21.3/MWh
Energy Value
Point of Interconnection
Nearest Substation
Brackettville Substation · 138 kV
Substation Distance
1.348 km
Operator
Rio Grande Electric Cooperative
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
ECLIPSE_UN1
Pricing Hub
HB_SOUTH
Secondary Zone
LZ_SOUTH
Location Type
Resource Node
Node Source
Curated node match
Texas utility enters tolling agreement with OCI Energy for 120MW/480MWh BESS
San Antonio, Texas, utility CPS Energy and developer OCI Energy have entered into a long-term storage capacity agreement (SCA) for a 120MW/480MWh battery...
Korea’s OCI, US partner CPS Energy sign 20-year energy storage deal
OCI Holdings Co. said on Tuesday it has signed a deal with US power supplier CPS Energy to jointly build a 120-megawatt solar cell plant and related battery...
OCI ENERGY AND CPS ENERGY ANNOUNCE 120 MW / 480 MWh BATTERY ENERGY STORAGE SYSTEM
120 megawatt (MW) – 480 megawatt-hour (MWh) - battery energy storage project called "Alamo City ESS LLC" which will be located in southeastern Bexar County,...
This big battery storage project will boost San Antonio’s grid
San Antonio's grid is about to get substantial backup with a 120-megawatt (MW), 480-megawatt-hour (MWh) battery storage project.
Last updated 2026-03-14
View all 10 articles