26.7 MW Hydro operating in Polk, TX — Midcontinent Independent Transmission System Operator, Inc..
26.7 MW
Nameplate Capacity
3
Generators
units
Conventional Hydroelectric
Technology
2020
Operating Since
Coordinates
30.6305, -95.0098
County
Polk, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | East Texas Electric Coop, Inc | — | — |
| Owner(s) | East Texas Electric Coop, Inc | — | — |
| Status | Operating | — | — |
The RC Thomas Hydroelectric Project is a 26.7 MW hydroelectric power plant located in Polk County, Texas. The plant began operating in 2020 and is owned and operated by East Texas Electric Coop, Inc. It utilizes conventional hydroelectric technology with three generators and its primary fuel source is water (WAT). The plant is within the Midcontinent Independent Transmission System Operator, Inc. balancing authority and the SERC NERC region.
In its most recent year of operation, the RC Thomas Hydroelectric Project generated 123,586 MWh of electricity, achieving a capacity factor of 52.9%. The plant is ranked as the 11th largest hydroelectric facility out of 24 in the state of Texas, and 431st out of 1464 nationally. The plant has been mentioned in four news articles, with three focusing on the industry and one on deals.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
138 kV
Regulatory Status
RE
Entity Type
Cooperative
Sector
Electric Utility
8.8K MWh
Latest Month
123.6K MWh
Annual Generation
52.9%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
EES.RCTHOMAS
Pricing Hub
TEXAS.HUB
Location Type
Generation Node
Node Source
EIA-860 direct report
Livingston Lions Club tours Lake Livingston Dam
Members of the Livingston Lions Club, along with Lake Livingston Project Manager Chad Holton, TRA Southern Region Executive Manager Doug...
Gazebo Nature Preserve at Lake Livingston Dam to host two public events
Local birders and bird lovers are invited to join Audubon Society's Christmas Bird Count at any time Saturday at the Gazebo Nature Preserve...
Lake Livingston Hydroelectric Plant Powers 12,000 Households
After eight years of planning, designing and building—plus flooding delays from Hurricane Harvey—the R.C. Thomas Hydroelectric Project on Lake Livingston is...
RUS Electric Program Finances Hydroelectric Power
RUS Electric Program approved $73 million in loan funds to finance ETEC's RC Thomas Hydroelectric Station (RC Thomas Station), formally known as the Lake...
Last updated 2026-03-26