100.3 MW Wind operating in Tuscola, MI — Midcontinent Independent Transmission System Operator, Inc..
100.3 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2013
Operating Since
Coordinates
43.5327, -83.5560
County
Tuscola, MI
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Tuscola Wind II LLC | NextEra Energy | — |
| Owner(s) | Tuscola Wind II LLC | NextEra Energy | — |
| Status | Operating | operating | — |
Tuscola Wind II LLC is a 100.3 MW wind power plant located in Tuscola County, Michigan. The plant began operating in 2013 and is owned and operated by Tuscola Wind II LLC, a subsidiary of NextEra Energy. The facility consists of a single generator utilizing onshore wind turbine technology. The turbines have a hub height of 80 meters and a rotor diameter of 100 meters, and were manufactured by GE Wind, model GE1.7-100.
In the most recent year of data, Tuscola Wind II generated 300,097 MWh of electricity, resulting in a capacity factor of 34.2%. The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the ReliabilityFirst Corporation (RFC) NERC region. Tuscola Wind II is ranked as the 18th largest wind farm in Michigan out of 19, and 718th nationally out of 734.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
120 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
36.2K MWh
Latest Month
300.1K MWh
Annual Generation
34.2%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
DECO.TUSCOLA2
Pricing Hub
MICHIGAN.HUB
Location Type
Generation Node
Node Source
Curated node match
Democrats' clean energy legislation sets up battle over local land use control
Michigan townships have rejected utility-scale wind and solar projects almost anywhere they've come to a vote. The state will soon be able...
Solar farming: A new kind of farm is being built on 1,000 acres in Marshall Township
The $130 million Cereal City Solar project constructed by NextEra is expected to generate $21 million in tax revenue for Marshall Township...
Offshore wind could provide double the electricity Michiganders used in 2019
By Taylor Haelterman. Coastal wind is a strong, consistent power source and Michigan's more than 3,000 miles of coast could provide double...
No turbines in my backyard: Why the Lansing BWL is struggling to invest in wind energy
A lawsuit has delayed construction of a wind farm in northern Michigan that would provide energy to the Lansing Board of Water & Light.
Last updated 2026-03-14
View all 10 articles