2.3 MW Solar operating in Riverside, CA — California Independent System Operator
2.3 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2013
Operating Since
Coordinates
33.9230, -116.5302
County
Riverside, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Consolidated Edison Solutions Inc. | Consolidated Edison Solutions Inc. | — |
| Owner(s) | Consolidated Edison Solutions Inc. | — | — |
| Status | Operating | operating | — |
Desert Hot Springs Solar is a 2.3 MW solar photovoltaic power plant located in Riverside County, California. The plant began operating in 2013 and has one generator. It is owned and operated by Consolidated Edison Solutions Inc. The facility utilizes single-axis tracking to maximize solar energy capture.
The plant's primary fuel source is solar energy. In its most recent year of operation, Desert Hot Springs Solar generated 4,540 MWh of electricity, achieving a capacity factor of 22.5%. The plant is interconnected to the California Independent System Operator (CAISO) balancing authority within the Western Electricity Coordinating Council (WECC) NERC region. Desert Hot Springs Solar ranks as the 485th largest power plant in California out of 862 facilities, and 4443rd nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
12 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
0 MWh
Latest Month
4.5K MWh
Annual Generation
22.5%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
DEVERS_1_N081
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match