24.9 MW Natural Gas operating in New Castle, DE — PJM Interconnection, LLC
24.9 MW
Nameplate Capacity
6
Generators
units
Other Natural Gas
Technology
2012
Operating Since
Coordinates
39.6120, -75.6268
County
New Castle, DE
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Diamond State Generation Partners, LLC | — | — |
| Owner(s) | Diamond State Generation Partners, LLC | — | — |
| Status | Operating | — | — |
Red Lion Energy Center is a 24.9 MW natural gas-fired power plant located in New Castle County, Delaware. The plant began operating in 2012 and is owned and operated by Diamond State Generation Partners, LLC. It consists of six generators utilizing "Other Natural Gas" technology. Red Lion Energy Center is ranked as the 7th largest power plant in Delaware (out of 9 total) and 1273rd nationally (out of 1963).
The plant operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. In the most recent year with available data, Red Lion Energy Center generated 183,488 MWh of electricity, achieving a capacity factor of 83.9%.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
135 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
15.6K MWh
Latest Month
183.5K MWh
Annual Generation
83.9%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Red Lion Substation · 230 kV
Substation Distance
0 km
Operator
Delmarva Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
REDLION 34.5 KV REDLINFC
Pricing Hub
WESTERN HUB
Location Type
Generation Node
Node Source
Curated node match
Ukraine: Current status of nuclear power installations
Zaporizhzhia nuclear power plant has six reactors. Khmelnytskyi nuclear power plant has two existing reactors and two reactors under construction.
Operation Epic Fury and the Remnants of Iran’s Nuclear Program
Following stalled nuclear negotiations between the United States and Iran, Operations Epic Fury and Roaring Lion move beyond previous...
xAI built an illegal power plant to power its data center
Just south of the Tennessee-Mississippi state line sits dozens of unpermitted gas turbines that power xAI's Colossus 2 data center while...
Navigating the US data center power crunch: On-site solutions offer a faster path to power
Discover how surging data center energy demand is outpacing US grid capacity. Read our expert analysis on navigating the data center power...
Last updated 2026-03-14
View all 10 articles