30 MW Hydro operating in San Juan, NM — Western Area Power Administration - Rocky Mountain Region
30 MW
Nameplate Capacity
2
Generators
units
Conventional Hydroelectric
Technology
1989
Operating Since
Coordinates
36.8053, -107.6137
County
San Juan, NM
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | City of Farmington - (NM) | — | — |
| Owner(s) | City of Farmington - (NM) | — | — |
| Status | Operating | — | — |
Navajo Dam is a hydroelectric power plant located in San Juan County, New Mexico. The plant has a total capacity of 30 MW, distributed across two generators. It commenced operations in 1989 and is owned and operated by the City of Farmington, New Mexico. The plant utilizes water (WAT) as its primary fuel source and employs conventional hydroelectric technology.
In the most recent year with available data, Navajo Dam generated 71,962 MWh of electricity, resulting in a capacity factor of 27.3%. The plant is interconnected with the Western Area Power Administration - Rocky Mountain Region balancing authority and operates within the Western Electricity Coordinating Council (WECC) NERC region. Navajo Dam is ranked as the largest of four hydroelectric plants in New Mexico, and 407th out of 1464 hydroelectric plants nationally.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
Western Area Power Administration - Rocky Mountain Region
Grid Voltage
115 kV
Regulatory Status
RE
Entity Type
Municipal
Sector
Electric Utility
1.4K MWh
Latest Month
72.0K MWh
Annual Generation
27.3%
Capacity Factor
No financial data available for this plant.
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.
The Navajo Nation Is Divided as Its Leader Embraces Trump, and Coal
As the economic engine for the region, coal offered solid work. But it has also used up water, polluted the air and raised health concerns.
New Pumped Hydropower Storage Project Aims For Fast-Track Approval
A proposed 1.5-gigawatt pumped storage hydropower project in New Mexico aims to leverage 70 hours of long duration energy storage capacity.
How Native Homes in New Mexico Are Tapping the Sun
An Indigenous-led nonprofit group is bringing solar power to Navajo Nation and the Hopi tribe, where about 15000 households lack access to...
In New Mexico, a Walk Commemorates the Nuclear Disaster Few Outside the Navajo Nation Remember
The Church Rock spill released more radioactive material than the partial meltdown at Three Mile Island four months earlier.
Last updated 2026-03-14
View all 10 articles