10.9 MW Solar operating in Imperial, CA — Imperial Irrigation District
10.9 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2014
Operating Since
Coordinates
32.7126, -115.5404
County
Imperial, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Axium US Solar Holdings LLC | Axium US Solar Holdings | — |
| Owner(s) | Axium US Solar Holdings LLC | — | — |
| Status | Operating | operating | — |
Heber Solar is a 10.9 MW solar photovoltaic power plant located in Imperial County, California. The plant began operating in 2014 and is owned and operated by Axium US Solar Holdings LLC. It utilizes a single-axis tracking system to maximize solar energy capture. As of the most recent data, Heber Solar generated 24,591 MWh annually, achieving a capacity factor of 25.7%.
Heber Solar operates within the Imperial Irrigation District balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. The plant is ranked 233rd out of 862 solar facilities in California and 1770th nationally out of 7108. Financial data is available for Heber Solar, sourced from LBNL Solar.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
Imperial Irrigation District
Grid Voltage
92 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
1.1K MWh
Latest Month
24.6K MWh
Annual Generation
25.7%
Capacity Factor
$81.9/MWh
LCOE (Levelized Cost)
$11.2/MWh
Energy Value
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.
Officials sign landmark energy deal that will serve millions of US residents: 'Supports long-term energy security'
Ormat Technologies has signed a 25-year extension with the Southern California Public Power Authority to continue supplying renewable...
Ormat extends 52-MW geothermal PPA with California power authority
Ormat Technologies Inc (NYSE:ORA) has sealed a 25-year extension of its power purchase agreement (PPA) with the Southern California Public...
Ormat extends PPA with SCPPA for Heber 1 geothermal facility until 2052
Geothermal and renewable energy company Ormat Technologies has signed a 25-year extension for its existing power purchase agreement (PPA)...
Ormat Technologies Signs 25-Year Power Purchase Agreement Extension with Southern California Public Power Authority to Deliver Clean Geothermal Energy
Ormat Technologies extends its power purchase agreement with SCPPA for geothermal energy, ensuring clean power delivery through 2052.
Last updated 2026-03-14