82.2 MW Natural Gas operating in Fort Bend, TX — Electric Reliability Council of Texas, Inc.
82.2 MW
Nameplate Capacity
1
Generators
unit
Natural Gas Fired Combustion Turbine
Technology
2013
Operating Since
Coordinates
29.4753, -95.6342
County
Fort Bend, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Petra Nova Power I LLC | Petra Nova Power I | — |
| Owner(s) | Petra Nova Power I LLC | ENEOS Holdings | — |
| Status | Operating | — | — |
The Petra Nova Carbon Capture Cogen plant is an 82.2 MW natural gas-fired power plant located in Fort Bend County, Texas. The plant began operating in 2013 and has one natural gas-fired combustion turbine generator. It is owned by ENEOS Holdings, a Japanese corporation, and operated by Petra Nova Power I LLC. The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority and the TRE NERC region.
In the most recent year of data, the plant generated 200,752 MWh of electricity, achieving a capacity factor of 27.6%. Petra Nova ranks as the 150th largest power plant in Texas out of 312 plants in the state, and 996th nationally out of 1963 plants.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP CHP
31.5K MWh
Latest Month
200.8K MWh
Annual Generation
27.6%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
ERCOT
LMP Node
PNPI_GT2_RN
Pricing Hub
HB_HOUSTON
Secondary Zone
LZ_HOUSTON
Location Type
Resource Node
Node Source
EIA-860 direct report
Google carbon capture deal paves way for greener gas plants
Google's carbon capture facility in Illinois is the first in a series of projects to reduce emissions from gas plants powering the AI boom.
Supreme Court Showdown: EPA Defends Carbon Capture Amid Power Industry Backlash
The Environmental Protection Agency (EPA) has doubled down on its stance that carbon capture is “adequately demonstrated” in a brief filed with the US Supreme...
The time is now: The Biden administration must adopt strict CO2 emission standards for the power sector
The Biden administration has an obligation to issue strict carbon dioxide emission standards for the power sector under the Clean Air Act.
The ill-fated Petra Nova CCS project: NRG Energy throws in the towel
NRG Energy Inc. just sold its 50 percent stake in the world's largest carbon capture plant for only about $3.6 million, less than a...
Last updated 2026-03-26