79.6 MW Wind operating in Carson, TX — Southwest Power Pool
79.6 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2012
Operating Since
Coordinates
35.3852, -101.5882
County
Carson, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | NextEra Energy Majestic Wind | NextEra Energy | — |
| Owner(s) | NextEra Energy Majestic Wind | NextEra Energy | — |
| Status | Operating | retired | — |
Majestic II Wind is a 79.6 MW wind power plant located in Carson County, Texas. The plant began operating in 2012 and is owned and operated by NextEra Energy Majestic Wind, a subsidiary of NextEra Energy. The facility consists of a single generator utilizing onshore wind turbine technology. Its turbines have a hub height of 80 meters and a rotor diameter of 82.5 meters. The turbines were manufactured by GE Wind, model GE1.5-82.5.
In the most recent year of data, Majestic II Wind generated 157,406 MWh, achieving a capacity factor of 22.5%. The plant is interconnected to the Southwest Power Pool (SPP) balancing authority and resides within the TRE NERC region. Majestic II Wind ranks as the 214th largest wind farm in Texas out of 245, and 820th nationally out of 1424.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Southwest Power Pool
Grid Voltage
115 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
14.4K MWh
Latest Month
157.4K MWh
Annual Generation
22.5%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Carson County Substation · 115 kV
Substation Distance
0 km
Operator
Xcel Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
SPP
LMP Node
NEE_MAJESTIC2
Pricing Hub
SPP South Hub
Node Source
Curated node match
Mystery site for 4.3-gigawatt energy hub has southwestern Pennsylvania officials wondering
NextEra Energy Transmission MidAtlantic plans a 107.5-mile power line through Greene and Fayette counties as the company scouts sites for a...
Red Flag Warning: Cimarron; Texas; Beaver; Dallam; Sherman; Hansford; Ochiltree; Lipscomb; Hartley; Moore; Hutchinson;
Red Flag Warning issued March 21 at 12:30PM CDT until March 21 at 8:00PM CDT by NWS Amarillo TX
Red Flag Warning: Cimarron; Texas; Beaver; Dallam; Sherman; Hansford; Ochiltree; Lipscomb; Hartley; Moore; Hutchinson;
Red Flag Warning issued March 21 at 12:30PM CDT until March 22 at 9:00PM CDT by NWS Amarillo TX
Spud Valley solar project on track to build in Alamosa County
NextEra Energy Resource's impressive solar project called Spud Valley Energy Center is making its way through the process at Alamosa County...
Last updated 2026-03-26
View all 10 articles