75 MW Wood Waste operating in Coos, NH — ISO New England Inc.
75 MW
Nameplate Capacity
1
Generators
unit
Wood/Wood Waste Biomass
Technology
2013
Operating Since
Coordinates
44.4715, -71.1708
County
Coos, NH
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Berlin Station, LLC | Berlin Station | — |
| Owner(s) | Berlin Station, LLC | Berlin Station LLC [100%] | — |
| Status | Operating | operating | — |
Burgess BioPower is a 75 MW biomass power plant located in Coos County, New Hampshire. The plant, which began operating in 2013, is owned and operated by Berlin Station, LLC. It utilizes wood and wood waste as its primary fuel source. The facility consists of a single generator and is interconnected to the ISO New England Inc. balancing authority within the NPCC NERC region.
In its latest year of reported generation, Burgess BioPower produced 348,592 MWh of electricity, achieving a capacity factor of 52.9%. The plant is ranked as the largest of six biomass facilities in New Hampshire and the sixth largest of 97 such plants nationally. News coverage of the plant includes 10 articles, with 8 focused on industry topics and 2 on regulatory matters.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
115 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Burgess BioPower
40.6K MWh
Latest Month
348.6K MWh
Annual Generation
52.9%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
ISO-NE
LMP Node
NH
Pricing Hub
.Z.NEWHAMPSHIRE
Node Source
EIA-860 direct report
Berlin Reviews Payment Plan for Biopower Plant
The plan would allow Burgess BioPower LLC to emerge from bankruptcy and continue to operate as a 75-megawatt biomass plant.
Berlin Reviews Payment Plan for Biopower Plant
The plan would allow Burgess BioPower LLC to emerge from bankruptcy and continue to operate as a 75-megawatt biomass plant.
Berlin Reviews Payment Plan for Biopower Plant
The plan would allow Burgess BioPower LLC to emerge from bankruptcy and continue to operate as a 75-megawatt biomass plant.
Berlin Reviews Payment Plan for Biopower Plant
The plan would allow Burgess BioPower LLC to emerge from bankruptcy and continue to operate as a 75-megawatt biomass plant.