11.5 MW Distillate Oil operating in Clay, MN — Southwest Power Pool
11.5 MW
Nameplate Capacity
5
Generators
units
Petroleum Liquids
Technology
2011
Operating Since
Coordinates
46.8661, -96.7464
County
Clay, MN
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | City of Moorhead - (MN) | — | — |
| Owner(s) | City of Moorhead - (MN) | — | — |
| Status | Operating | — | — |
Centennial Generating Station is a 11.5 MW power plant located in Clay County, Minnesota. The plant began operating in 2011 and is owned and operated by the City of Moorhead. The primary fuel source is distillate fuel oil (DFO), and the plant utilizes petroleum liquid-fueled generators. There are a total of five generators at the facility.
Centennial Generating Station operates within the Southwest Power Pool (SPP) balancing authority and the Midwest Reliability Organization (MRO) NERC region. Based on capacity, the plant ranks as the 19th largest out of 59 power plants in Minnesota, and 298th out of 886 plants nationally.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Southwest Power Pool
Grid Voltage
115 kV
Regulatory Status
RE
Entity Type
Municipal
Sector
Electric Utility
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Centennial Substation · 115 kV
Substation Distance
< 10 km
Operator
Moorhead Public Service
Coord Source
OSM spatial
Market Position
ISO/RTO Market
SPP
LMP Node
—
Pricing Hub
SPP North Hub
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
Nidec’s Kato Engineering™ Brand Celebrates 100 Years of Power and Performance
North Mankato, Minnesota, US — January 20, 2026 Nidec Power proudly celebrates the 100th anniversary of its Kato Engineering™ brand,...
OPG Embarks on Major Refurbishment of Niagara Falls Hydropower Stations
Ontario Power Generation (OPG) will partner with GE Vernova to complete a 15-year project to refurbish the iconic 1.7-GW Sir Adam Beck I and...
OPG Embarks on Major Refurbishment of Niagara Falls Hydropower Stations
Ontario Power Generation (OPG) will partner with GE Vernova to complete a 15-year project to refurbish the iconic 1.7-GW Sir Adam Beck I and...
Patrick Barron, Jr. Obituary January 1, 2022
Patrick John Joseph Barron, Jr. (AKA {especially to youngsters, whom he challenged to remember it} Patrick John Joseph Peter Alexander...
Last updated 2026-03-14
View all articles