192 MW Natural Gas operating in Vigo, IN — Midcontinent Independent Transmission System Operator, Inc..
192 MW
Nameplate Capacity
1
Generators
unit
Natural Gas Fired Combustion Turbine
Technology
1995
Operating Since
Coordinates
39.5323, -87.4260
County
Vigo, IN
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Wabash Valley Power Assn, Inc | — | — |
| Owner(s) | Wabash Valley Power Assn, Inc | — | — |
| Status | Operating | — | — |
The Wabash Valley Power IGCC plant is a 192 MW natural gas-fired power plant located in Vigo County, Indiana. The plant, which began operating in 1995, is owned and operated by Wabash Valley Power Association, Inc. It utilizes a single natural gas-fired combustion turbine generator. The plant operates within the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and the ReliabilityFirst Corporation (RFC) NERC region.
In the most recent year of reported data, the plant generated 354,088 MWh, achieving a capacity factor of 21.0%. The installed cost of the plant was $856.21 per kW, according to FERC data. The Wabash Valley Power IGCC plant is ranked 15th out of 20 power plants in Indiana and 758th out of 945 plants nationally.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
230 kV
Regulatory Status
RE
Entity Type
Cooperative
Sector
Electric Utility
38.4K MWh
Latest Month
354.1K MWh
Annual Generation
21.0%
Capacity Factor
$941/kW
Installed Cost
Wabash Valley Power Association, Inc.
Reporting Utility
Cumulative Installed Cost
Per-Unit Cost Trends
Market Position
ISO/RTO Market
MISO
LMP Node
CIN.WRHILND
Pricing Hub
INDIANA.HUB
Location Type
Generation Node
Node Source
EIA-860 direct report
Is Polygeneration the Future for Clean Coal?
Some visionaries think the future is in generating not just power but a range of products from coal gasification. Getting there will be no easy task.
Duke to Retire Four Coal Units Under New Edwardsport IGCC Settlement
Duke Energy will retire four coal units and possibly two oil-fired units under terms of a settlement reached between the company and four citizen and...
Duke to Retire Four Coal Units Under New Edwardsport IGCC Settlement
Duke Energy will retire four coal units and possibly two oil-fired units under terms of a settlement reached between the company and four citizen and...
Duke to Retire Four Coal Units Under New Edwardsport IGCC Settlement
Duke Energy will retire four coal units and possibly two oil-fired units under terms of a settlement reached between the company and four citizen and...
Last updated 2026-03-26
View all 8 articles