3 MW Solar operating in Sacramento, CA — Balancing Authority of Northern California
3 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2012
Operating Since
Coordinates
38.4661, -121.1778
County
Sacramento, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | MN8 Energy LLC | MN8 Energy | — |
| Owner(s) | MN8 Energy LLC | — | — |
| Status | Operating | operating | — |
RE Dillard 2 LLC is a 3 MW solar photovoltaic power plant located in Sacramento County, California. The plant began operating in 2012 and has a single generator. The primary fuel source is solar, and the plant utilizes single-axis tracking technology to maximize energy capture. MN8 Energy LLC is the operator of the facility.
The plant operates within the Balancing Authority of Northern California (BANC) and is part of the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, RE Dillard 2 LLC ranks as the 397th largest solar plant in California out of 862, and 3881st nationally out of 7108. The plant's latest annual generation was 6,115 MWh, resulting in a capacity factor of 23.2%.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
Balancing Authority of Northern California
Grid Voltage
69 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
180 MWh
Latest Month
6.1K MWh
Annual Generation
23.2%
Capacity Factor
No financial data available for this plant.