1 MW Solar operating in Madera, CA — California Independent System Operator
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2009
Operating Since
Coordinates
36.9421, -120.1582
County
Madera, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | SunE GIL1, LLC | SunE GIL1 | — |
| Owner(s) | SunE GIL1, LLC | — | — |
| Status | Operating | operating | — |
The City of Madera WWTP is a 1 MW solar photovoltaic power plant located in Madera County, California. The plant began operating in 2009 and has a single generator. It is owned and operated by SunE GIL1, LLC. The plant utilizes dual-axis solar tracking technology to maximize energy capture.
The City of Madera WWTP operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, the plant is ranked 772 out of 862 power plants in California, and 6334 out of 7108 nationally. The plant's latest annual generation was 1,426 MWh, resulting in a capacity factor of 16.2%.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
0.48 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
83 MWh
Latest Month
1.4K MWh
Annual Generation
16.2%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_ZP26_GEN-APND
Node Source
OSM spatial match