1.3 MW Solar operating in Cumberland, PA — PJM Interconnection, LLC
1.3 MW
Nameplate Capacity
2
Generators
units
Solar Photovoltaic
Technology
2010
Operating Since
Coordinates
40.2152, -77.2050
County
Cumberland, PA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Carlisle Area School District | — | — |
| Owner(s) | Carlisle Area School District | — | — |
| Status | Operating | — | — |
CASD Solar is a 1.3 MW solar photovoltaic power plant located in Cumberland County, Pennsylvania. The plant began operating in 2010 and has two generators. It is owned and operated by the Carlisle Area School District. The primary fuel source is solar energy. The plant utilizes dual-axis solar tracking technology.
CASD Solar operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. In terms of size, it ranks 80th out of 87 solar plants in Pennsylvania and 6089th out of 7108 nationally. The latest annual generation data indicates an output of 1 MWh, resulting in a capacity factor of 0.0%.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
12.5 kV
Regulatory Status
NR
Entity Type
Municipal
Sector
Commercial Non-CHP
1 MWh
Latest Month
1 MWh
Annual Generation
0.0%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
West Carlisle Substation
Substation Distance
2.578 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
CARL PL 69 KV TAP4
Pricing Hub
WESTERN HUB
Location Type
Load Node
Node Source
Curated node match