800 MW Natural Gas operating in Riverside, CA — California Independent System Operator
800 MW
Nameplate Capacity
8
Generators
units
Natural Gas Fired Combustion Turbine
Technology
2013
Operating Since
Coordinates
33.9342, -116.5714
County
Riverside, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Sentinel Energy Center LLC | — | — |
| Owner(s) | Diamond Generating Corporation, Meridian Clean Energy | — | — |
| Status | Operating | — | — |
Sentinel Energy Center, LLC is an 800 MW natural gas-fired power plant located in Riverside County, California. The plant began operating in 2013 and consists of eight natural gas-fired combustion turbine generators. It is owned and operated by Sentinel Energy Center LLC. The facility is connected to the California Independent System Operator (CAISO) balancing authority within the Western Electricity Coordinating Council (WECC) NERC region.
In its most recent year of operation, the Sentinel Energy Center generated 140,118 MWh of electricity, resulting in a capacity factor of 2.0%. The plant is ranked as the 11th largest in California out of 76 power plants, and 250th nationally out of 945 plants. Recent news coverage related to the plant includes one article categorized as a hazard.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
230 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
762 MWh
Latest Month
140.1K MWh
Annual Generation
2.0%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
TOT032G1_7_N001
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
EIA-860 direct report
Best Energy/Industrial: Sentinel Energy Center Battery Energy Storage System with Black Start
Black start capability enables a power plant to restore operations after a total loss of power.
Power plant owner gets new trial on liability for worker’s death
A California appellate court overturned a jury's $150 million verdict in favor of the family of a worker killed in a power plant explosion...