4.8 MW Landfill Gas operating in Benton, TN — Tennessee Valley Authority
4.8 MW
Nameplate Capacity
3
Generators
units
Landfill Gas
Technology
2012
Operating Since
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | WM Renewable Energy LLC | WM Renewable Energy | — |
| Owner(s) | WM Renewable Energy LLC | Waste Management | — |
| Status | Operating | — | — |
West Camden is a 4.8 MW landfill gas-fueled power plant located in Benton County, Tennessee. The facility began operating in 2012 and is owned by Waste Management, with WM Renewable Energy LLC as the listed operator per EIA data. The plant consists of 3 generators utilizing landfill gas technology. It is connected to the Tennessee Valley Authority balancing authority within the SERC NERC region.
West Camden's latest annual generation was 38,060 MWh, achieving a capacity factor of 90.3%. Among landfill gas plants in Tennessee, West Camden is ranked 1 out of 3. Nationally, it is ranked 126 out of 284 landfill gas plants.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Tennessee Valley Authority
Grid Voltage
12.5 kV
Regulatory Status
NR
Entity Type
Industrial
Sector
IPP Non-CHP
3.2K MWh
Latest Month
38.1K MWh
Annual Generation
90.3%
Capacity Factor
No financial data available for this plant.
Market Position
LMP Node
TVA
Pricing Hub
—