14 MW Geothermal operating in Beaver, UT — PacifiCorp - East
14 MW
Nameplate Capacity
1
Generators
unit
Geothermal
Technology
2013
Operating Since
Coordinates
38.1607, -113.1945
County
Beaver, UT
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Thermo No 1 BE 01 LLC | Thermo No 1 BE 01 LLC [100%] | — |
| Owner(s) | Thermo No 1 BE 01 LLC | Thermo No 1 BE 01 LLC [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as Thermo No 1 BE 01 LLC [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
Thermo No 1 is a 14 MW geothermal power plant located in Beaver County, Utah. The plant, which began operating in 2013, is owned and operated by Thermo No 1 BE 01 LLC. It consists of a single generator utilizing geothermal technology and is fueled by geothermal resources (GEO). Thermo No 1 ranks as the fourth-largest geothermal plant in Utah out of five such plants, and 62nd nationally out of 70.
The plant operates within the PacifiCorp - East balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In its latest year of reported generation, Thermo No 1 produced 57,730 MWh of electricity, achieving a capacity factor of 47.0%.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
PacifiCorp - East
Grid Voltage
24.9 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
5.3K MWh
Latest Month
57.7K MWh
Annual Generation
47.0%
Capacity Factor
No financial data available for this plant.
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.
Last updated 2026-03-26
View all 9 articles