174.3 MW Wind operating in Logan, CO — Public Service Company of Colorado
174.3 MW
Nameplate Capacity
2
Generators
units
Onshore Wind Turbine
Technology
2009
Operating Since
Coordinates
40.9881, -102.8969
County
Logan, CO
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Northern Colorado Wind LLC | NextEra Energy | — |
| Owner(s) | Northern Colorado Wind LLC | NextEra Energy | — |
| Status | Operating | retired | — |
Northern Colorado Wind LLC is a 174.3 MW wind power plant located in Logan County, Colorado. The plant began operating in 2009 and is owned and operated by Northern Colorado Wind LLC, a subsidiary of NextEra Energy. It utilizes two onshore wind turbine generators. The facility is interconnected to the Public Service Company of Colorado balancing authority within the Western Electricity Coordinating Council (WECC) NERC region.
The plant's primary fuel source is wind (WND). The wind turbines have a hub height of 80 meters and a rotor diameter of 91 meters. The turbines were manufactured by GE Wind, model GE1.6-91. In the most recent year of data, the plant generated 557,526 MWh, achieving a capacity factor of 36.4%. Northern Colorado Wind LLC ranks as the 16th largest wind farm out of 21 in Colorado, and 413th out of 734 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
Public Service Company of Colorado
Grid Voltage
230 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
52.3K MWh
Latest Month
557.5K MWh
Annual Generation
36.4%
Capacity Factor
No financial data available for this plant.
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.
United Power seeks "hyperlocal" energy for Colorado customers after dumping longtime supplier
Brighton-based co-op is building a portfolio of suppliers after paying $627M to leave Tri-State Generation and Transmission Association.
Renewable energy industry powers new job growth in SD
With wind farms leading the way, SD and its strong technical college system have put the state on the forefront of training energy workers.
Northern Colorado Utility to Build 100-MW Battery System
Platte River Power Authority signed an agreement with NextEra Energy Resources, part of a Colorado renewable power push that includes...
Colorado Utility Develops First Large-Scale Battery Storage System
Colorado-based wholesale public power provider Platte River Power Authority announced it is working with Weld Energy Storage, a subsidiary...
Last updated 2026-03-14