162 MW Wind operating in Columbia, WI — Midcontinent Independent Transmission System Operator, Inc..
162 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2011
Operating Since
Coordinates
43.5639, -89.1481
County
Columbia, WI
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Wisconsin Electric Power Co | WE Energy Group | — |
| Owner(s) | Wisconsin Electric Power Co | WEC Energy Group | — |
| Status | Operating | operating | — |
Glacier Hills is a 162 MW wind power plant located in Columbia County, Wisconsin. The plant began operating in 2011 and is owned by WEC Energy Group, with Wisconsin Electric Power Co. listed as the operator. It utilizes a single generator consisting of multiple onshore wind turbines. The facility is interconnected to the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and is within the RFC NERC region. Glacier Hills is the largest of three wind plants in Wisconsin, and ranks 443rd out of 734 wind plants nationally.
The plant's turbines are Vestas V90-1.8 models, with a hub height of 80 meters and a rotor diameter of 90 meters. In its most recent year of operation, Glacier Hills generated 368,625 MWh, achieving a capacity factor of 26.0%. Financial data indicates an installed cost of $2,288.81 per kW, based on FERC filings.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
138 kV
Regulatory Status
RE
Entity Type
Investor-Owned Utility
Sector
Electric Utility
39.8K MWh
Latest Month
368.6K MWh
Annual Generation
26.0%
Capacity Factor
$2,258/kW
Installed Cost
$9.9/MWh
Operating Cost
Wisconsin Electric Power Company
Reporting Utility
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Market Position
ISO/RTO Market
MISO
LMP Node
WEC.GLACRHLS
Pricing Hub
MICHIGAN.HUB
Location Type
Generation Node
Node Source
EIA-860 direct report
TC Energy completes Wisconsin Reliability Project
TC Energy has officially announced commercial in-service of its Wisconsin Reliability Project (WRP), a $700 million natural gas pipeline...
We Energies biomass plant begins commercial operation
We Energies has announced that the biomass-fueled power plant on the site of Domtar Corp.'s Rothschild, Wis., paper mill was placed into commercial...
We Energies biomass plant begins commercial operation
We Energies has announced that the biomass-fueled power plant on the site of Domtar Corp.'s Rothschild, Wis., paper mill was placed into commercial...
We Energies biomass plant begins commercial operation
We Energies has announced that the biomass-fueled power plant on the site of Domtar Corp.'s Rothschild, Wis., paper mill was placed into commercial...
Last updated 2026-03-26
View all 10 articles