168 MW Wind operating in DeKalb, MO — Associated Electric Cooperative, Inc.
168 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2010
Operating Since
Coordinates
39.9814, -94.5181
County
DeKalb, MO
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Pattern Operators LP | Wind Capital Group | — |
| Owner(s) | Pattern Operators LP | Pattern Energy [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as Pattern Energy [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
Lost Creek Wind Energy Facility is a 168 MW wind power plant located in DeKalb County, Missouri. The facility began operating in 2010 and is owned and operated by Pattern Operators LP. The plant utilizes one onshore wind turbine generator. It is interconnected to the Associated Electric Cooperative, Inc. balancing authority within the SERC NERC region.
The wind farm's turbines have a hub height of 80 meters and a rotor diameter of 82.5 meters. The turbines were manufactured by GE Wind and are model GE1.5-82.5. In its most recent year of operation, Lost Creek generated 380,290 MWh of electricity, achieving a capacity factor of 25.9%. Lost Creek Wind Energy Facility is the 8th largest wind farm in Missouri out of 11, and ranks 425th nationally out of 734 wind plants.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Associated Electric Cooperative, Inc.
Grid Voltage
161 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
39.0K MWh
Latest Month
380.3K MWh
Annual Generation
25.9%
Capacity Factor
No financial data available for this plant.
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.
Red Flag Warning: Atchison; Doniphan; Leavenworth; Atchison; Nodaway; Worth; Gentry; Harrison; Holt; Andrew; De Kalb;
Red Flag Warning issued March 21 at 11:23AM CDT until March 21 at 10:00PM CDT by NWS Kansas City/Pleasant Hill MO
Red Flag Warning: Atchison; Doniphan; Leavenworth; Atchison; Nodaway; Worth; Gentry; Harrison; Holt; Andrew; De Kalb;
Red Flag Warning issued March 21 at 11:23AM CDT until March 21 at 10:00PM CDT by NWS Kansas City/Pleasant Hill MO
Western states brace for a uranium boom as nation looks to recharge nuclear power industry
After years of federal efforts to revive nuclear power, old mines are stirring again in Wyoming, Texas and Arizona, while new ones line up...
2024 Story of the Year: 109 turbine wind farm is getting built in Sumner County
NextEra Energy Resources is building the Wild Plains Wind Farm, expanding across the Sumner County skyline between Wellington and Oxford, six miles north and...
Last updated 2026-03-21
View all 10 articles