120 MW Wind operating in Jack, TX — Electric Reliability Council of Texas, Inc.
120 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2009
Operating Since
Coordinates
33.0744, -98.3342
County
Jack, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Avangrid Power LLC | Avangrid Renewables | — |
| Owner(s) | Avangrid Power LLC | Avangrid | — |
| Status | Operating | operating | — |
Barton Chapel Wind Farm is a 120 MW wind power facility located in Jack County, Texas. The plant began operating in 2009 and utilizes a single generator consisting of multiple onshore wind turbines. The facility is owned by Avangrid and operated by Avangrid Power LLC. The primary fuel source is wind (WND).
The wind farm's turbines have a hub height of 78 meters and a rotor diameter of 87 meters. The turbines were manufactured by Gamesa and are model G87-2.0. In its latest year of reported generation, Barton Chapel Wind Farm produced 210,862 MWh of electricity, achieving a capacity factor of 20.0%. The plant operates within the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority. Barton Chapel Wind Farm is ranked as the 188th largest wind farm in Texas out of 200, and 611th nationally out of 734.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
18.6K MWh
Latest Month
210.9K MWh
Annual Generation
20.0%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
ERCOT
LMP Node
BRTSW_BCW1
Pricing Hub
HB_NORTH
Secondary Zone
LZ_NORTH
Location Type
Resource Node
Node Source
Curated node match
Avangrid Welcomes First Class to Newly Built National Training Center
Avangrid, Inc. (NYSE: AGR), a leading sustainable energy company and member of the Iberdrola Group, this week welcomed the first class of...
Last updated 2026-03-14
View all articles