10 MW Wind operating in Morrow, OR — PacifiCorp - West
10 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2009
Operating Since
Coordinates
45.6447, -119.4533
County
Morrow, OR
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Echo 2 | — | — |
| Owner(s) | Echo 2 | — | — |
| Status | Operating | — | — |
Four Mile Canyon Windfarm LLC is a 10 MW wind power plant located in Morrow County, Oregon. The facility, which began operating in 2009, is owned and operated by Echo 2. It utilizes a single onshore wind turbine manufactured by REpower, model MM92, with a rotor diameter of 92.5 meters and a hub height of 80 meters. The plant is interconnected to the grid within the PacifiCorp - West balancing authority, operating within the Western Electricity Coordinating Council (WECC) NERC region.
In its most recent year of operation, Four Mile Canyon Windfarm generated 20,817 MWh of electricity, achieving a capacity factor of 23.7%. The plant is ranked as the 27th largest wind facility in Oregon out of 49, and nationally it is ranked 1164 out of 1424 wind plants.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
PacifiCorp - West
Grid Voltage
69 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
1.2K MWh
Latest Month
20.8K MWh
Annual Generation
23.7%
Capacity Factor
No financial data available for this plant.
Market Position
LMP Node
HINKLE_NODET
Pricing Hub
—