49.5 MW Wind operating in Pipestone, MN — Midcontinent Independent Transmission System Operator, Inc..
49.5 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2009
Operating Since
Coordinates
44.1025, -96.0562
County
Pipestone, MN
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Avangrid Power LLC | Avangrid Renewables | — |
| Owner(s) | Avangrid Power LLC | Avangrid | — |
| Status | Operating | operating | — |
Moraine II Wind LLC is a 49.5 MW wind power plant located in Pipestone County, Minnesota. The plant began operating in 2009 and is owned by Avangrid, with Avangrid Power LLC as the operator. It consists of a single generator utilizing onshore wind turbine technology. The facility is interconnected to the Midcontinent Independent Transmission System Operator, Inc. (MISO) and resides within the MRO NERC region.
The plant utilizes GE Wind GE1.5-77 wind turbines, featuring a rotor diameter of 77 meters and a hub height of 80 meters. In the most recent year of reported data, Moraine II Wind generated 72,881 MWh of electricity, achieving a capacity factor of 16.7%. The plant is ranked as the 33rd largest wind facility in Minnesota out of 123, and 949th nationally out of 1424 wind plants.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
115 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
8.3K MWh
Latest Month
72.9K MWh
Annual Generation
16.7%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Tholen Interconnection Station · 35 kV
Substation Distance
0 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
NSP.MORAINE2
Pricing Hub
MINN.HUB
Location Type
Generation Node
Node Source
Curated node match
Seeing double the solar installations in Oregon | Projects Weekly
Avangrid has energized two solar projects in Wasco County, Oregon, totaling 200 MWac. Plus, Zelestra has expanded its relationship with Meta...
Avangrid switches on 57 MW Camino Solar in California | Projects Weekly
In this edition of Projects Weekly, we highlight Avangrid's newest project in California, plus all the latest solar project news you missed.
Avangrid switches on 57 MW Camino Solar in California | Projects Weekly
In this edition of Projects Weekly, we highlight Avangrid's newest project in California, plus all the latest solar project news you missed.
Avangrid Signs Blue Creek Power Deal with American Municipal Power
Avangrid signed a short-term power purchase agreement with American Municipal Power for a portion of the energy produced from the Blue Creek...
Last updated 2026-03-26
View all 10 articles