18.9 MW Wind operating in Utah, UT — PacifiCorp - East
18.9 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2008
Operating Since
Coordinates
40.0729, -111.5844
County
Utah, UT
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Spanish Fork Wind Park 2, LLC | Edison Mission Group; Clearway Energy Group | — |
| Owner(s) | Spanish Fork Wind Park 2, LLC | Clearway Energy | — |
| Status | Operating | operating | — |
Spanish Fork Wind Park 2 LLC is a wind power plant located in Utah County, Utah. The plant, owned and operated by Spanish Fork Wind Park 2, LLC, a subsidiary of Clearway Energy, began operating in 2008. It has a total capacity of 18.9 MW consisting of a single generator utilizing onshore wind turbine technology. The facility ranks 4th out of 4 wind plants in Utah and 1100th out of 1424 nationally.
The plant uses Suzlon S88 wind turbines, with a rotor diameter of 88 meters and a hub height of 79 meters. In the most recent year of data, the plant generated 42,217 MWh of electricity, achieving a capacity factor of 25.5%. The plant is located within the PacifiCorp - East balancing authority, which operates within the Western Electricity Coordinating Council (WECC) NERC region.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
PacifiCorp - East
Grid Voltage
46 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
4.0K MWh
Latest Month
42.2K MWh
Annual Generation
25.5%
Capacity Factor
No financial data available for this plant.
Market Position
LMP Node
WECC
Pricing Hub
—