180 MW Wind operating in Dickey, ND — Midcontinent Independent Transmission System Operator, Inc..
180 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2008
Operating Since
Coordinates
45.9593, -98.9463
County
Dickey, ND
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Acciona Wind Energy USA LLC | Acciona | — |
| Owner(s) | Acciona Wind Energy USA LLC | Acciona | — |
| Status | Operating | operating | — |
The 180 MW "Tatanka Wind Farm", is located in Dickey County and McIntosh County, North Dakota, and McPherson County, South Dakota. It is the largest wind farm in North and South Dakota and generates enough renewable energy to power more than 60,000 U.S. homes.
Read more on WikipediaTatanka Wind Power LLC is a 180 MW wind farm located in Dickey County, North Dakota. The plant began operating in 2008 and utilizes one generator consisting of onshore wind turbines. It is owned by Acciona, a Spanish company, and operated by Acciona Wind Energy USA LLC. The facility ranks as the 9th largest wind farm in North Dakota out of 27, and 400th nationally out of 734.
The wind farm's turbines have a hub height of 80 meters and a rotor diameter of 82 meters. The turbines were manufactured by Acciona and are model AW82/1500. In its most recent year of operation, the plant generated 476,125 MWh of electricity, achieving a capacity factor of 30.3%. The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
230 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
26.3K MWh
Latest Month
476.1K MWh
Annual Generation
30.3%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
MDU.TATANKA.1
Pricing Hub
MINN.HUB
Node Source
EIA-860 direct report