180 MW Wind operating in Dickey, ND — Midcontinent Independent Transmission System Operator, Inc..
180 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2008
Operating Since
Coordinates
45.9593, -98.9463
County
Dickey, ND
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Acciona Wind Energy USA LLC | Acciona | — |
| Owner(s) | Acciona Wind Energy USA LLC | Acciona | — |
| Status | Operating | operating | — |
The 180 MW "Tatanka Wind Farm", is located in Dickey County and McIntosh County, North Dakota, and McPherson County, South Dakota. It is the largest wind farm in North and South Dakota and generates enough renewable energy to power more than 60,000 U.S. homes.
Read more on WikipediaTatanka Wind Power LLC is a 180 MW wind farm located in Dickey County, North Dakota. The plant began operating in 2008 and utilizes one generator consisting of onshore wind turbines. It is owned by Acciona, a Spanish company, and operated by Acciona Wind Energy USA LLC. The facility ranks as the 9th largest wind farm in North Dakota out of 27, and 400th nationally out of 734.
The wind farm's turbines have a hub height of 80 meters and a rotor diameter of 82 meters. The turbines were manufactured by Acciona and are model AW82/1500. In its most recent year of operation, the plant generated 476,125 MWh of electricity, achieving a capacity factor of 30.3%. The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
230 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
26.3K MWh
Latest Month
476.1K MWh
Annual Generation
30.3%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
MDU.TATANKA.1
Pricing Hub
MINN.HUB
Node Source
EIA-860 direct report
Spain’s ACCIONA powers up Laguna’s Kalayaan 2 wind farm with first turbine
Spanish renewable energy firm ACCIONA Energía has installed the first turbine at its 101-megawatt (MW) Kalayaan 2 Wind Farm in Laguna,...
Acciona Buys Seven Battery Energy Storage Projects with 1 GW Pipeline in Texas
Acciona Energía has acquired the 190 MW/380 MWh battery energy storage system (BESS) facility in Cunningham, Texas, U.S., from Qcells,...
ACCIONA Energía acquires largest battery storage project in Texas (190MW) and 1GW of bess pipeline
The 190MW/380MWh Cunningham facility will be the largest operating battery energy storage project on the Texas grid upon commissioning next year.
ACCIONA Energía continues dynamic growth in the US
The company is on track to double its installed capacity to more than 2,600 MW, driven mainly by solar PV projects.
Last updated 2026-03-26
View all articles