1 MW Distillate Oil operating in Rutherford, NC — Duke Energy Carolinas
1 MW
Nameplate Capacity
1
Generators
unit
Petroleum Liquids
Technology
2007
Operating Since
Coordinates
35.3619, -81.8344
County
Rutherford, NC
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | North Carolina Mun Power Agny #1 | — | — |
| Owner(s) | North Carolina Mun Power Agny #1 | — | — |
| Status | Operating | — | — |
Bostic Delivery No 2 is a 1 MW petroleum-fueled power plant located in Rutherford County, North Carolina. The plant began operating in 2007 and has one generator utilizing petroleum liquids technology. It is owned and operated by North Carolina Municipal Power Agency #1.
The plant operates within the Duke Energy Carolinas balancing authority and the SERC NERC region. Bostic Delivery No 2 is ranked as the 45th largest power plant in North Carolina out of 45 plants, and 874th nationally out of 886 plants.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Duke Energy Carolinas
Grid Voltage
12.47 kV
Regulatory Status
RE
Entity Type
Municipal
Sector
Electric Utility
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
No financial data available for this plant.
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.