204 MW Wind operating in Klickitat, WA — Bonneville Power Administration
204 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2007
Operating Since
Coordinates
45.8155, -120.3419
County
Klickitat, WA
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | White Creek Wind 1 LLC | NAES | — |
| Owner(s) | White Creek Wind 1 LLC | Summit Power | — |
| Status | Operating | operating | — |
The White Creek Wind Farm is an electricity generating wind farm facility in Klickitat County, Washington, United States. It is owned by Last Mile Electric Cooperative and began operations in 2007. The facility has a generating capacity of 205 megawatts.
Read more on WikipediaWhite Creek Wind Farm is a 204 MW wind power facility located in Klickitat County, Washington. The plant began operating in 2007 and is owned by Summit Power, a company based in Bangladesh. The operator reported to the EIA is White Creek Wind 1 LLC. The facility utilizes a single generator comprised of multiple Siemens SWT-2.3-93 onshore wind turbines. These turbines have a rotor diameter of 93 meters and a hub height of 80 meters.
In the most recent year of reported data, White Creek Wind Farm generated 563,726 MWh of electricity, achieving a capacity factor of 31.5%. The plant is interconnected to the grid within the Bonneville Power Administration balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. White Creek Wind Farm is ranked as the 6th largest wind farm out of 17 in Washington state, and 254th out of 734 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
Bonneville Power Administration
Grid Voltage
230 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
29.3K MWh
Latest Month
563.7K MWh
Annual Generation
31.5%
Capacity Factor
No financial data available for this plant.
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.
Last updated 2026-03-14
View all 8 articles