200 MW Wind operating in Shackelford, TX — Electric Reliability Council of Texas, Inc.
200 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2008
Operating Since
Coordinates
32.5298, -99.5079
County
Shackelford, TX
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Mesquite Wind LLC | EDPR Renewable Energy Sources of Greece 1 Sole Proprietorship | — |
| Owner(s) | Mesquite Wind LLC | EDPR Renewable Energy Sources of Greece 1 Sole Proprietorship [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as EDPR Renewable Energy Sources of Greece 1 Sole Proprietorship [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
Post Oak Wind LLC is a 200 MW wind power plant located in Shackelford County, Texas. The facility began operating in 2008 and is operated by Mesquite Wind LLC. The plant utilizes a single generator consisting of onshore wind turbines. The wind turbines have a hub height of 78 meters and a rotor diameter of 87 meters. The turbines were manufactured by Gamesa and are model G87-2.0.
In the most recent year of data, Post Oak Wind generated 413,996 MWh of electricity, achieving a capacity factor of 23.7%. The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, within the Texas Reliability Entity (TRE) NERC region. Post Oak Wind is ranked as the 109th largest power plant in Texas out of 200, and the 328th largest in the United States out of 734.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
345 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
43.8K MWh
Latest Month
414.0K MWh
Annual Generation
23.7%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Horton Substation · 138 kV
Substation Distance
< 10 km
Operator
Golden Spread Electric Cooperative
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
Abbott Announces $278 Million Loan for Freestone County Power Plant Ahead of Data Center Boom
October 15, 2025 - Governor Greg Abbott has announced a new Texas Energy Fund (TxEF) loan to support construction of a 460-megawatt natural...
Data centers are building their own gas power plants in Texas
Not long ago, developers of the massive server farms talked about powering them with wind and solar energy. Now they're bypassing the grid...
Renewable energy developer with Houston presence raises $1.2B in capital from international investors
EnergyRe, a national developer of renewable energy projects with a presence in Houston, secured a $1.2 billion capital package with investments from three...
Solar and wind companies are coming to rural Texas. These residents are trying to keep them out.
In Franklin County, a group of locals are concerned about potential environmental harm from renewable energy facilities and support a bill...
Last updated 2026-03-14
View all 7 articles