84 MW Wind operating in Borden, TX — Electric Reliability Council of Texas, Inc.
84 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2006
Operating Since
Coordinates
32.9537, -101.2197
County
Borden, TX
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | FPL Energy Red Canyon LLC | NextEra Energy | — |
| Owner(s) | FPL Energy Red Canyon LLC | NextEra Energy | — |
| Status | Operating | retired | — |
Post Wind Farm LP is an 84 MW wind power plant located in Borden County, Texas. The plant began operating in 2006 and is owned by NextEra Energy, with FPL Energy Red Canyon LLC as the operator. It consists of a single generator utilizing onshore wind turbine technology. The facility uses GE Wind GE1.5-87 turbines, which have a rotor diameter of 87 meters and a hub height of 80 meters.
The plant's latest annual generation was 314,763 MWh, resulting in a capacity factor of 42.7%. Post Wind Farm LP operates within the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority. According to available rankings, the plant is the 207th largest in Texas out of 245 plants, and the 789th largest nationally out of 1424 plants.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
24.6K MWh
Latest Month
314.8K MWh
Annual Generation
42.7%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Red Canyon Wind Substation · 138 kV
Substation Distance
< 10 km
Operator
NextEra Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
RDCAN-RDCNY1
Pricing Hub
HB_WEST
Node Source
EIA-860 direct report
Fire Weather Watch: Sacramento Foothills and Guadalupe Mountains; Chaves County Plains; Eddy Plains; Lea; Gaines; Dawson
Fire Weather Watch issued March 21 at 2:43AM CDT until March 23 at 12:00AM CDT by NWS Midland/Odessa TX
NextEra profits beat estimates as company preps for nuclear restart
NextEra Energy's renewable power business helped the major U.S. electricity provider beat Wall Street's third-quarter profit estimates on...
'We set the rules': Texas regulators defend $5B program for gas plants after withdrawals, denials
Texas utility regulators are defending the state's $5 billion fund for new natural gas power plants after numerous projects have dropped out of the taxpayer-...
Why some power plant companies are rejecting loans from $5 billion Texas program
Four companies have pulled their natural gas power plant projects from consideration from the $5 billion Texas Energy Fund loan program.
Last updated 2026-03-21
View all 10 articles