43.5 MW Wind operating in Dickinson, IA — Midcontinent Independent Transmission System Operator, Inc..
43.5 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2003
Operating Since
Coordinates
43.3844, -95.2989
County
Dickinson, IA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Avangrid Power LLC | PPM Energy | — |
| Owner(s) | Avangrid Power LLC | Avangrid | — |
| Status | Operating | operating | — |
Flying Cloud Power Partners LLC is a 43.5 MW wind power plant located in Dickinson County, Iowa. The plant began operating in 2003 and is owned by Avangrid, with Avangrid Power LLC as the operator. It consists of a single generator utilizing onshore wind turbine technology. The facility uses GE Wind GE1.5-70.5 turbines, with a rotor diameter of 70.5 meters and a hub height of 80 meters.
The plant's latest annual generation was 80,981 MWh, resulting in a capacity factor of 21.2%. Flying Cloud Power Partners is ranked 72nd out of 122 power plants in Iowa and 961st out of 1424 nationally. The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the Midwest Reliability Organization (MRO) NERC region.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
240 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
8.4K MWh
Latest Month
81.0K MWh
Annual Generation
21.2%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Flying Cloud Substation · 69 kV
Substation Distance
2.197 km
Operator
ITC
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
ALTW.FCLDFCL1
Pricing Hub
MINN.HUB
Location Type
Generation Node
Node Source
Curated node match
Seeing double the solar installations in Oregon | Projects Weekly
Avangrid has energized two solar projects in Wasco County, Oregon, totaling 200 MWac. Plus, Zelestra has expanded its relationship with Meta...
Owners of former Beckjord site owe $640K in delinquent taxes
Two of the largest delinquent taxpayers in Clermont County are the owners of the former Walter C. Beckjord coal plant site, who collectively...
NextEra Energy’s AI Strategy: Analysis of Dominance in Energy
This report provides an exhaustive analysis of why NextEra Energy, Inc. (NEE) is uniquely positioned not merely to participate in this transformation, but to...
NextEra Energy’s AI Strategy: Analysis of Dominance in Energy
This report provides an exhaustive analysis of why NextEra Energy, Inc. (NEE) is uniquely positioned not merely to participate in this transformation, but to...
Last updated 2026-03-26
View all 10 articles